Good work takes time.

We plan before we build and fix the schedule in writing. A realistic timeline is part of the quality, not a promise to be broken.

Kitchen detail: stone, brass and oak
01

Brief and estimate

Tell us about the space. You get a live estimate, then a designer reviews your plan and confirms the numbers.

02

Concept and design

Mood direction, layout options, 3D visuals and the full drawing package. Nothing is built until you approve.

03

Materials and approvals

Selection with samples, prices shown as supplier cost plus 20%. We prepare the documents and coordinate permits through licensed consultants. Delivery from China by sea takes from about 30 days (in stock) to 8 to 12 weeks (made-to-order) from the order.

Runs alongside design
04

Execution

Rough works, finishes and installation under one team. The schedule is fixed in the contract. Each stage is secured by DealBridge escrow and released when you approve it. How payments are protected →

From 2 months
05

Handover and warranty

Final walk-through, snag list closed, then a 3-year workmanship warranty from handover.

3-year warranty
In the contract

Six things we put in writing.

01Fixed priceWritten inclusions and exclusions. Changes only through a signed variation.
02Fixed scheduleStart, stages and handover dates in the contract. Penalty terms for delays caused by us are written into the contract.
03Paid by stageEach payment is tied to an accepted stage and held through DealBridge until it is accepted.
04Photo report per stagePhotos of every stage before it is accepted and paid. A regular update in your chat.
05Materials as separate linesSupplier cost, our 20%, freight, duty and VAT shown separately.
06Warranty in writing3 years on workmanship from handover, in addition to your statutory rights.
WHY IT TAKES TIMEApprovals, materials and finishing cannot be rushed.Fast promises usually mean cut corners or a late handover. We would rather give you an honest date and keep it.
IN WRITINGSchedule and payments sit in the contract.Dates are set after design approval, when scope and materials are known.
AFTER HANDOVER3-year workmanship warranty.Materials follow the manufacturer warranty.