Fair reasons
Market prices. When the region is unstable, freight, insurance and some imported materials get more expensive. A good contractor shows the supplier invoice and asks you before buying.
Your changes. Moving a wall, upgrading stone or adding lighting after approval changes both price and schedule. That is normal, as long as it is written down before the work.
Hidden conditions. Old installations behind walls or damaged waterproofing appear only after demolition.
Unfair reasons
Lines like “finishing works, lump sum” with no quantities. Missing drawings, so decisions are made on site and billed later. A low first number designed to win the job.
How we handle it
Rates per m² published before you sign, materials at supplier cost plus 20% with every line visible, a drawing album and specification before work starts, price changes approved by you before purchase, and stage payments through DealBridge escrow.